Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts

Thursday, September 17, 2009

Water Pressure Fixed, Dishwasher Installed

The plumbers were at the house Tuesday and Wednesday this week taking care of odds and ends as well as running the new line from the attic to address the low hot water pressure.


They put the dishwasher in place and hooked it all up. Now that it's in the hole, I have to complete my idea of putting the legs back together with the brackets we made. It's going to be a tight squeeze getting my hands under there. I'm going to try it tonight. We can't test the unit until the legs are back together and the top is screwed to the wood plate to keep it from jumping around.



On the spa tub, they hooked up the replacement control pad and attached the air pump. So we were able to fill the tub and run it with the bubbles for the first time! That was cool. The pump was loud, but that may change. I still have to complete the cement board and tile panels around the front of the tub and create a access door to close off the opening in the closet that provides access to the pump. So I can probably do some sound insulating things there to muffle the noise. I had forgotten a feature I learned about early on: that the air pump comes back on a few minutes after you turn it off. It waits to give the water time to drain, and then it comes back on to dry any remaining water out of the conduits. This is supposed to keep mold and bad smells from creeping in.



Regarding the new hot water line, the guys started the work the first day, but ran into doubts about whether the new line to the master bath would fix the problem. They cut the sheetrock in the wall and started to cut pipes, etc. Then they started asking me if I had any more pictures of the pipes behind walls in other bathrooms. Hmm... I started to get a little worried! It turns out they were just being cautious. It was their boss who had told them where to run the line, but they weren't sure why.



They came back the next day having gotten a deeper explanation from him. Apparently, there's a problem with lines running under the slab between the half bathroom and the laundry room fixtures. We know this because the laundry room sink is the first place you begin to see a difference in hot and cold water pressure. But it's not really obvious until you run both the laundry room sink AND another fixture in the master bathroom, which is downstream. So, the course of action chosen was to run another hot water line directly from the tank in the attic to the master bathroom where it joins up with the existing system again. Here's the diagram:




The old line from the laundry room to the master bath is still hooked up. So the hot water system is kind of weird. It's being supplied at two points. One thing I need to keep an eye on is: assuming there's a kink in the line between the half bath and laundry room, it COULD develop into a leak years down the road. So I could potentially have a leak under the slab that's not near the outside perimeter. Meaning it won't be accessible to fix!

Thursday, September 3, 2009

Grouting in Progress, Second Front Yard Chain Wall

I only have 4 more tiles to lay in my pantry and I'll be done with that! In the meantime, I started grouting the rest of the tile floor. The foyer and A/V closet are done. At that point, we changed gears to build the second chain wall in my front yard. I wanted to take advantage of what was supposed to be "cooler" weather. It wasn't as cool as a couple of weeks ago, but at least it was down into the upper 80s!


I neeed to call the plumber back over to put the dishwasher in now that I've got the legs cut and it can be slid into the hole.

My sofa and love seat are in at the store, and they're going to hold onto them for me until I get the floors grouted.

I also need to chose my tile for the kitchen backsplash and get that done. Then I could mount the range hood. After that, once I get the cabinet guys to stain the wood for the front of the kitchen island they can come out to finish the cabinet trim. Then the fridge goes into place, and I can call for my final inspection!

Here are some pictures from yesterday when we were preparing to pour the new chain wall:








Friday, August 7, 2009

Tiling Final Room! Ordered Sofa.

I'm now tiling the TV room! As of last night, I'm about half way there. This room is going pretty fast since there are no measurements and cuts to be made for the most part. It's just wide open space. Last night, I laid 19 more of the large 20x20 tiles. That covered a lot of floor.

Today there was a tax holiday for the Louisiana state sales tax. I took advantage of the 4% savings to order my sofa and love seat for this room. Delivery will be 4-6 weeks. It's a La-Z-Boy recliner sofa. Chocolate colored microfiber fabric that has a feel similar to leather. It's nice to finally get to the furniture stage!

On the issue of the two plumbing problems, the countertop guys are supposed to call me this afternoon to meet with them about the dishwasher height problem. I dread having them take the top out and re-do it higher, but it's the best solution. I've searched, but I can't find a dishwasher short enough to fit in the space as-is even if I wanted to. The last option is to rip out the tile in the alcove where the unit goes. These tiles overflow out in front of the cabinet, and I'd need to re-tile in front of the unit once it's installed. This also means that I'd have to tear up the tile yet again if the unit ever needs to be removed.

I need to call the plumber back about the bypass on the hot water line. He had suggested running a line to the master bath because he thought the laundry room was okay. I don't think the pressure is right in the laundry room either. This means we need to look at it again together and determine the right location for the bypass.

In case I didn't mention it earlier, the driveway guys finally did come back out and fix where the two parts were separating. All they had to do was remove two or three rows of pavers and put them back in making the spaces even. Then they put sand back in between, and you can't tell the difference.

Friday, July 31, 2009

Final Stage Problems: Plumbing

The plumber has worked to finish his stuff today and yesterday (7/30 and 7/31). He's brought two issues to my attention: First, the dishwasher doesn't fit under the counter now that I've tiled inside the alcove it sits in. He says that, with a countertop lip like mine, they usually lay plywood across the cabinet before laying the countertop. This elevates the slab so that the lip doesn't hand down and hinder the opening. I'm meeting with the countertop people to see what they can do to help. In the meantime, I'm researching to see if a shorter dishwasher is even available.

The second problem is that the pressure for the hot water is lower than the cold water in the master bath. Somehow, the flow is constricted. He guesses that the copper tube under the slab was crimped by the slab workers when they dug out the footing walls. The hot water line runs from the attic down into the half bath. Then underground to feed the laundry and then the master bath. He thought the laundry seemed unaffected, but I think it's affected too. In any case, the only solution he can recommend is to branch off the hot water line in the attic and try to bypass the crimped line by coming down another wall and joining up with the system down the line. This means tearing out a strip of sheetrock to install the new line. It looks like I have no choice here.

On the bright side, my spa tub is now installed along with the rest of my toilets. The plumber got his final inspection. So we're good to go on that front.

Wednesday, May 27, 2009

Operational Pause in Tiling

After a good week making progress on the tiling, I've started another job as an independent software developer for that local oil refinery. So this week, I'm starting to put a majority of my time into that.

In the last two weeks, I've finished grouting the master bath and the spa tub deck (I still have to tile the walls in there), and the hallway between the guest bedrooms. I also put tile as the baseboard in the laundry room and grouted that. The only floors I have left to tile are the big rooms: the kitchen and the TV room. That should go fairly quick once I start.

I can't remember if I mentioned that all my sinks are hooked up. The plumbers have those and two of my toilets in. So now I can reap the benefits of my $9,000 sewer hookup! We moved the washer and dryer into the laundry room and hooked up the dryer before we left the other day. So the laundry room is finished except for the eventual cabinets that will go in.

Best Buy was originally scheduled to deliver the new fridge and take the damaged one today. But the new one has been delayed in shipping. No problem! No hurry there.

I can't wait to start tiling the rest of the house! I'm hoping to finish the big rooms before I start hosting a small group for my church next month. Even if I'm not living there, it will work for holding a meeting.

Thursday, May 7, 2009

Tiling Update

Two of the bathrooms are completely tiled and grouted, as well as the laundry room. The master bath floor is almost tiled. I ran out of 12in tiles and had to order more. I'm picking them up today. Yesterday, we started tiling the spa tub deck. That's excrutiating because almost every tile needs to be cut to fit.

The plumbers are supposed to come out today and install some toilets and sinks for me.

Also yesterday, we finally unpacked the refrigerator and found some bad news: the top corder looks like it was beaten up in shipping. The metal body and the door are badly bent, and when you open the door you can see the damage continues inside. I had the appliances delivered from Best Buy at the beginning of the year so I would know how big to have my cabinet openings built. I know that I should have checked them all thoroughly before now, but other work was occupying my time. I'm hoping they don't give me a lot of trouble trying to exchange it. I still have a house full of electronics to buy, and they'd be saving a good customer by accomodating me.

Tuesday, June 10, 2008

Copper Theft!

My bricklayers left on Thursday afternoon. I went over that night to pick up around the yard. Friday morning, my sheetrock guy went over to take care of the walls that will be soundproofed. On Saturday morning, my dad and I arrived to find that some of my copper had been stripped from the house!

They took the entire line of copper from the air handler in the attic to the unit in the backyard, and they got some plumbing pipe. Luckily, that's all. As far as plumbing, they took small pieces from the master bathroom and a good portion of the middle (guest) bathroom. In that room, they got all the copper out of the wall with the bathub faucet. They even broke one line off at the concrete slab...

I filed a police report (for all the good that will do). It's hard to tell whether it was kids, or one of my contractors or their workers, or just somebody looking for quick money to support a drug habit. They didn't take any tools, equipment, or other materials we had laying around. They didn't get to several copper lines that would have been easy to remove. They dropped a couple of pieces on the way out the front door, which may mean they left in a hurry.

So I spent Saturday boarding up the openings that have no doors in the front and installing my back door with a lock. One upside is that I can now say I have the keys to my new house! I also setup security lights inside. Of course, all anyone has to do to eliminate the light is unplug the extension cord from the temporary pole in the front yard, but it's something I guess. I also setup a battery-operated motion detector with a siren just inside the back door.

I would tend to think this was someone who had been keeping an eye on the place over time. They must have known that the brick-layers were packed and gone. And having the sheetrock providing new privacy from the street meant it was safer for them to work without being seen. Did they work in the middle of the night? If so, why did they seem to leave so suddenly? Why did they leave stuff that was so easy to get to? It makes me angry and stressed and also creeped out. Like someone is now watching me and my project without me knowing it.

The plumbers have already been there to replace all that was taken. They had to bust up the concrete where the line was broken at the slab. The HVAC guy has been by to assess his situation and plans to reinstall his line this week. And my electrician needs to look today at one line that they cut in order to get at the HVAC line.

And wouldn't you know that the electrical inspector FINALLY showed up this morning and couldn't get in because the place was locked up! I wonder how far that's going to set me back. He's supposed to try again tomorrow. Yeah, right.

All-in-all, I'm glad it wasn't much worse (Thank you, Lord!). It served as a wake-up call to get the place secured. The insurance company informs me it might not be worth my while to file a claim. I have a $2,000 deductible to begin with. If the replacement costs aren't much more than that, then filing a claim will cost me more in the long run because my insurance will go up. I'll lose my "no-claim" discount, and yada yada... Gee, I'm so glad I have insurance.


Here is the house with completed bricks after all the scaffolding was removed.



In this picture, you can see where they snapped off copper lines at the slab.



This is the master bath where they broke off small pieces.



Here, you can see the straps that used to hold the AC copper line.



And here are my first real walls of the house: the sheetrock is in place where they need to spray insulation on the other side.

Monday, April 14, 2008

Rough-in Progress

The plumber installed the tub and the in-wall portions of the valves for the tub & showers on Friday (4/11). That's the same day I started running the cable, telephone, and network lines with my dad. We've spent a total of about 18 hours so far over 3 days. We've finished every room except the kitchen and the runs that go from the media closet to the TV wall.

For the cabling, I've ordered some things I knew I would need. I've got rubber boots that go on the cat 5 cable before you put the connector at the end. These boot prevent the plastic press-down tab on the connector from snagging on other cables. Here is a picture of what I'm talking about. I also ordered some labels for each coax, network, and telephone cable. It's a product called KableFlags, and it looks to be the best solution I've seen so far. I have a Dymo label printer, and I used those labels temporarily until my KableFlags get here. They are already peeling off!

Today, the A/C installers were there again. He said they were finishing some copper runs and "pressurizing". I'm not sure what that means.

The heater/vent/lights have shipped! As soon as they get here, I can call my electrician and A/C guy in to get those hooked up and vented to the soffit. My electrician's wife is having triplets by c-section on 4/25, so I'm hoping I can get him down to finish these few things before then!

The plumber is waiting on my copper roof jacks to be made, and then he can run the stacks out the roof. I'll get my roof put on right after that.

Rough-in Pictures

Here are some pictures I took today of the rough-in progress so far. There are more pictures I want to take, but my camera batteries ran out!

First, here are the plumbing lines run for the washer & dryer:

Here are the wall boxes I have in the wall to go behind my TV. I'm assuming a wall-mounted plasma set. The box on the lower left is for power. The other two boxes are for coax, ethernet, HDMI, and any other cables I may need to run from the media closet to this location. Notice that I put PVC conduits to run media cables through. This wall will have spray foam insulation. So the conduits preserve a way to change out the cables later on:


Here is the breaker panel in the laundry room with all the electrical wires coming in. The electricians joked that I have enough wire running through the house to hold it together in a storm even if the framing gives out! :)



And finally, here's the bathtub in the "guest" or "kids" bathroom:

Monday, April 7, 2008

Rough-ins Coming to a Close; Hunting for Materials

Last week, my air conditioning guys finished their work (and he's ready for his first payment). The electrician finished running all his wire on Friday, and my plumber started working on his pipes and vent stacks on Saturday. I've been stressing out over ordering materials that I should have had already, like the exterior doors, the heater/vent/lights for the bathrooms, and some stuff that the plumber needs in order to finish his work. I've got my two bids on this stuff. Now it's a matter of comparing the prices and the different brands offered.

Like everything else, the heater/vent/lights are not a straighforward thing to get. There are choices among brands, among noise levels, among how many cubic feet per minute (CFMs) they can vent, and even among features. Some have a night light. Most don't have a heater. Some just have a fan. Uggh! Make it stop! :)

It also turns out that I'm going to be running all my own telephone, cable, and computer wires everywhere. I originally thought I would be doing that, and then my electrician told me he had assumed he was doing it. That was a relief in a way. I looked forward to doing it so I could say I did something like that on my own house, but then again I know it's a lot of work. He took longer than he planned with the electrical wiring, so he made a deal with me to reduce his fee and let me run the other stuff. So I'm saving money and getting the chance to do something I want to learn about. On the flip side, it's going to take me some time since I'm new at it.

I've decided on my bricklayers. I'm going with the very first ones I talked to. They are cheapest (at $8,020), and their work was very good. The woman I'm working with at the brickyard also highly recommends them. I just called him tonight and setup a meeting tomorrow so he can look at the house.

The brickyard sent me home with a few samples of my Magnolia Blend bricks, along with samples of different kinds of pavers to go on the front porch and back patio. The samples of my brick are all pretty much the same color, so it's not easy to pick out the roof color and the pavers.

As for roofers, I'm waiting on one final bid. The neighbor behind me used them to replace her roof after Katrina. They came out to measure on Friday (and the guy left his ladder), but he hasn't given me a price yet. The owner sent one of his supervisor-type guys to measure, and I asked him to look at where the roof is leaking through the felt. He said he had a guy who could stop by that evening on his way home and fix the felt so it wouldn't leak. Of course, that guy never came. It rained that night, and I found some new spots where it leaked. According to the bids I have so far, I'm going to need somewhere between 55 and 68 squares. A square is a 10ft x 10ft area.

On my latest bill from the lumber yard, they haven't credited me for 3 rolls of Tyvek housewrap I sent back. So I've been on the phone with them to take care of that. I think that's all the brain dump I'm capable of right now. More later...

Wednesday, April 2, 2008

Doors and Bricks

I put down a deposit of $2,000 on the bricks today. The total bill is right at $9,700. They're already starting to accummulate my bricks in their yard.

I also ordered my two remaining external doors today: the patio door and the side entry door for the rear garage. That total came to $984! Everything you spend on a house seems to be on the order of either $1,000 or $10,000... I went to the vet to pick up medicine for the dog the other day, and the total was $5. I thanked the lady and said how great it felt to pay a total that's less than a thousand dollars! :)

Yesterday, I visited my second plumbing supply company to decide on fixtures. It took over four hours. Mostly due to the salesman who had lots of helpful info to share on everything from kitchen sinks to tubs. The total estimate was (are you ready for this?) $9,600! Oh my! And that doesn't include the kitchen sink or the kitchen faucet. We ran out of time.

My plumber hasn't started the rough-in yet. He said he might start on Tuesday. It has rained off and on over the past couple of days. A really good downpour yesterday afternoon. My felted roof leaks in the kitchen right in front of the refrigerator slot.

Friday, March 28, 2008

Rough-ins Commencing

My HVAC sub started his rough-in on Wed. of this week. The plumber was supposed to start this week, but I haven't heard anything definite. With only one day left, I'm not sure if that'll happen. My electrician is starting tomorrow.

The AC guys have the air handler, the plenums, and some of the flex duct run in the attic. I decided to go with an electronic air filter. It is expensive at $980, but in the overall cost of the house this isn't much. I'm considering this to be one of the perks of owner-building: you get to upgrade some things because of the money you save. And I think this will help keep the air cleaner, which means less dusting and cleaning for me to do! Over the life of the house, that's worth it to me.

I bought all my electrical wire, as per my agreement with the electrician. He estimated it would cost me under $1,000. It actually cost me $1,800 for the bulk of it. I haven't bought the main breaker panel or the sub-panel for the garage, not to mention each breaker that goes in them. He's from the Northshore, and everything seems to run cheaper up there.

I bought the gable vents today, and the framers installed them. They also installed the pocket doors I bought on Tuesday. In fact, the framers are pretty much done. I love my framers. They even put blocking in the walls where I'll need to screw the top and bottom of my kitchen wall cabinets. They are very tight and thorough.

I've fallen behind in ordering my exterior doors. I still haven't done it. This may set me back a week or so as far as getting the brick layer in to start his work. I've only been concentrating on the doors part time, and only on the fancy front door (the double doors with an eyebrow arch across the top). The one I really wanted isn't available in the width I need, which is a double 2'-8" door. The ones in this range don't appeal to me as much as far as the window shapes and glass. They range in price from $1,800 to $4,600. Anyway, I need to get my doors ordered fast!

Tuesday, February 5, 2008

Progress on Fat Tuesday

Three words of advice: inspect, inspect, inspect! After the plumber finished installing the drains and the underground copper last week, I walked the lot to make sure all the necessary lines were in place. I saw that there was no water line to the icemaker in the kitchen. I called him on Monday (yesterday) morning. They had just had the parish inspection. He thanked me for noticing that because they had completely forgotten about the icemaker. They installed that line, along with the utility room floor drain, that day.

With all the plumbing done, it's the slab crew's turn to come back and dig the footings (chain walls) down to the pilings.

Today, it's Mardi Gras here in southern Louisiana. Those festivities stopped being attractive to me long ago. But I was told that all the slab guys would have the day off. So I asked the slab guy to CALL ME when they would be out there again. He said he would. I went out this afternoon to do a little cleanup and organizing of wood stakes, etc. Lo and behold, the crew was there digging out the trenches with shovels! Hey, at least they're ahead of schedule. But I wish they'd let me know when they're going to be there.

If they dig these trenches and then it rains, the trenches will get filled in and they'll need to clear them again. But hopefully we won't have much rain, and they can finish them quickly. Then, I'll need to schedule the termite treatment of the soil and the installation of the poly layer & post tension cables (hopefully one right after the other).

Thursday, January 31, 2008

Plumbing Continues

They made more progress on the plumbing today until it started raining heavily around 4:30. Drainage to the kitchen island is done. So is the "kids" bathroom, as well as the vent stacks and toilet drain in the garage. When I left, they were digging out the trench for the main drain to run out the front of the house. I've got 4 drain clean-outs so far. One more to come, I think. The plumber commented at how much pipe I have under there. Here are some photos:



My electrician is coming out tomorrow now to help lay some of the underground lines. He'll meet me at the lot to make a shopping list and we'll go together to get the stuff from a local supply house. We can use his account to get things cheaper.

The plumber advised against putting any electrical runs in the slab until they dig out all the chain walls. He said it could get knocked out of place. Also the main electrical conduit out front could get damaged if heavy trucks roll on top of it. But it would be three feet down, so I'm not sure how much damage could be done. We'll see how it goes...

Plumbing, Plumbing, Everywhere!

It's very exciting to see the drainage pipes being laid out across the lot. It's like the floorplan is coming to life! I hope to post some pictures soon. When you look at the locations of everything, it doesn't look like the house will be that big. But I know it will eventually look fine. I've read that it always looks smaller than you envisioned as you poor the slab and start framing.

So the plumbers started on Monday. They did most of the master bath, the utility room, and maybe started on the powder room. I don't think they worked Tuesday, because I went out there around 3PM and it looked pretty much the same as it did on Monday around the same time. They did work yesterday (Wednesday). I stopped by and they had done the extensions to the kitchen. They should be working today.

He said they should be finished and inspected by Friday. After the inspection, the slab guys can come back out and dig the chain walls. My electrician friend also said he will come down on Monday and help me with the electrical components that go under the slab. This includes the floor outlet in the living room, running the line to the kitchen island, and running a conduit from the house slab to the garage slab. I'm going to try to get my plumber to dig the trench for my electrical service line while they have their trench digger at the site. With this done, I could lay the line from the utility pole to the house now. If the plumber can't/won't do it, then a rental would be about $380.

I'm also waiting for the results of the survey they will be doing now that the slab forms are up. That was scheduled for last week, but apparently they didn't get to it. I'm checking with them today.

Monday, January 28, 2008

Plumbing Started

The plumber started today laying drainage pipes that go under the slab. I went to the lot at 9AM. A guy named Matt who works for my plumber was there with the trench digger, but the plumber wasn't there yet.

The plumber called me around 1PM to say that the wall in the powder room behind the lavatory needs to be a 2x6 wall just like the opposite wall. We also decided that the floor drain in the utility room will drain directly to the outside instead of into the main sewer line. This is because a back-up in the sewer line would mean sewage would come up through the floor.

My mom and I stopped by the lot around 3PM. The plumber said they had started around 10 or 11. They had most of the drains run for the master bathroom area of the house and had started on the utility room next door. That was all I saw.

He needs me to tell him exactly which air tub I'm going to have in the master bath tomorrow. I think I've settled on the Kohler K-1375-G, the 6ft Revival model. My mom and I went to a few bathroom showrooms today and saw some Jacuzzis, Kohlers, Jason tubs, etc. None of the salespeople were particularly helpful...

So plumbing work continues tomorrow. Hopefully, it won't rain. The parish has not come to install the water meter yet.

Friday, January 25, 2008

Water and Plumbing to Come

I went to the parish office yesterday to pay for my water meter and schedule installation. You ready for this cost? $1,150! Yikes! That breaks down to a $100 deposit + $250 installation fee + a whopping $800 amount for something called a "plant investment fee". I'm assuming that's one "investment" I'll never see a return from. :-(


They give you this green placard that you need to place on the property where you want the water meter located. I met with the plumber this morning to place it. Here's where we chose to put it (by the red dot).

And in case you were wondering, the blue areas are supposed to be the size of a car on the driveway and in the garage... When I paid for the meter, the girl asked me if I wanted it installed that day. Yeah, right. Like they're going to get to it the SAME day. I just called them to see when it is scheduled for. They said it's not even in their system yet. This is something I'm going to have to keep an eye on. Don't want them to lose my work order after paying all that money!

The plumber is planning to start his work on Monday. I'm in the process of selecting things like the master bath tub so that he'll know where the drain will be, etc. I originally wanted a water jet tub because I like how the massage feels. But those tubs require a lot of maintenance to clean out the water system each time you use it so that it doesn't grow mold. So now I'm considering an air-bubble tub.


Tuesday, January 15, 2008

Progress on Slab Form

Yesterday, the crew made a lot of progress on the slab form. The material take-off from the lumber yard assumed I would need one layer of 2x12's to go all the way around. That was before I found out I needed to build the slab higher if I want to avoid needing flood vents in the front garage. It turns out I need two 2x12's stacked almost all the way around (except where the slab is lower, such as the patio and parts of the front garage. They used all the lumber from the original take-off, which got most of the form done.



The plumber can start working now. And I can get the dirt inside the form to pad it up. The slab guys will come back to put additional 2x12's later. I wasn't able to talk to the lead guy about those arrangements. When they started in the morning (around 8:30), the owner's son was with the crew. When I went back later in the day, the son was gone and another guy had been left in charge. I'm glad he could speak English! I need to contact them to find out when, and I need to order the lumber.


I brought a garbage can over there for them, also. I hadn't thought to do that on the day they staked out the pilings, and a lot of trash & debris blew over to my good neighbor's yard.

Also, the portable toilet was delivered yesterday.

Thursday, October 11, 2007

The Gears of the Bidding Process Turn Slowly... and Other Delays!

I've had a few breakthroughs in getting recommendations for subs in trades that I was having trouble with. For example, I finally brought my plans to the excellent framer across the street from me. Although timing may prevent him from doing the work, he gave me a price and he also gave me names of a slab guy, a plumber, and a recommendation for a lumber yard. When I called the lumber yard, she gave me two other recommendations for framers. My mom's friend gave me the number of a plumber he really recommends. I also had the Laplace concrete company to refer me to two other slab guys.

I've visited three slabs now done by people bidding on my job. Each one has had its weak points. Either the top was rough/uneven or the brick ledges and sides were a mess. I'm not sure how much of the sides I should worry about since they may come back and finish it off later. But the top definitely needs to be level, flat, and smooth.

I made my first attempt at a permit this week. Right away, the plan reviewer found things he needed clarified in a letter from the engineer. Apparently in Jefferson Parish, any part of a structure that's less than 5 ft from the property line needs to be fire rated for one hour. Two walls of my garage, and the overhang on one side of the house are within this limit. So I'm working on getting that letter now. At the same time, the reviewer told me the wall between the house and the attached garage needed to be fire rated and he was able to just write that in on the plans. If he could write in notes about the interior wall, why couldn't he write in the notes about the exterior walls?

Oh, and the permits office told me that they have nothing to do with giving me my address number (which contradicts what they told me over the phone). When I told him I didn't know the address number, he seemed aggrivated. So he sent someone around to figure it out. In their computer system, my lot and the neighbor's lot (which was one big lot at one time) still had the old house that straddled the dividing line. Eventually, they were able to determine that my house number is 624. During the visit, he pulled up aerial photos of the area to verify that there were indeed two lots and that a new house had already been built on the adjoining lot. I wish I could have gotten a copy of that photo, even though it was taken shortly after Katrina and still had all the trees on it.

On the positive front, the power company is on schedule to have the new utility pole installed by Nov. 1. Then I can have my temporary electricity feed off the new pole. Speaking of electricians, I'm waiting on two other electrical bids and my HVAC bid.

When visiting a slab today, I met the owner of the house who told me three things to make sure I have before my final inspection:

  • Your house number posted (and make sure the numbers are large enough)
  • Any steps are the right height/size, and
  • Your mailbox installed

He also told me about another company besides the citizen's FAIR plan for obtaining wind and hail insurance. It's Republican Insurance. A quick Google search revealed more than one match. I'm not sure which one he was talking about, but he said you can save a lot by going through them.