I only have 4 more tiles to lay in my pantry and I'll be done with that! In the meantime, I started grouting the rest of the tile floor. The foyer and A/V closet are done. At that point, we changed gears to build the second chain wall in my front yard. I wanted to take advantage of what was supposed to be "cooler" weather. It wasn't as cool as a couple of weeks ago, but at least it was down into the upper 80s!
I neeed to call the plumber back over to put the dishwasher in now that I've got the legs cut and it can be slid into the hole.
My sofa and love seat are in at the store, and they're going to hold onto them for me until I get the floors grouted.
I also need to chose my tile for the kitchen backsplash and get that done. Then I could mount the range hood. After that, once I get the cabinet guys to stain the wood for the front of the kitchen island they can come out to finish the cabinet trim. Then the fridge goes into place, and I can call for my final inspection!
Here are some pictures from yesterday when we were preparing to pour the new chain wall:
1 comment:
The tile looks wonderful! You did a great job.
Mary,
Ron-Del
Post a Comment