This Week in Homebuilding...

So it's been a week since I added an entry, huh? Let's see what I can remember:

The electrical inspector came back on Wednesday or Thursday, and he was a jerk about some stuff. I wasn't there, but my electrician was (he was working on the outside trim at the time). The inspector was an older gentleman who complained about everything from having to step up too high to get into the house to several electrical issues. These included the need for deeper gang boxes wherever there were three wires going into a single gang switch box, an additional outlet under my bay window by the patio, and some additional stuff he wanted to see done in the breaker box.

I had read somewhere that code requires an electrical outlet for every 12 feet of wall. However, who knew that they'd be butt-heads about it even when the 12 feet consists of a bay window that stretches from floor to ceiling. When my electrician told him there wasn't room for one under the window, the inspector told him I'd just have to cut a notch in my floor trim to make room for it. Yeah, that's attractive...

The trim work has progressed to the front of the house. One gable is now done (see photo below). The other gable looks to be the only thing left on the house. My friend is moving slower than he predicted because the guy he assumed would help him has dumped him for another job at the moment. The garage is next to be trimmed. I had to return the Durock sheets I bought from Home Depot in order to get the Hardie Backer (from Lowe's) that he really needs.




I also returned the two 8-inch round columns I had bought. The tops would have extended out in front and behind of the header around my patio. I didn't think that would look good. So I special ordered two 6-inch square ones on Monday. These are made of fiberlgass like the round ones were.

I got my quotes for interior doors this week. The first one was from the door & window place. He came out to measure first. The total is around $3,200. Next, I took his list to Home Depot and Lowe's to get comparisons. It's hard to compare every door as apples-to-apples because two of them are different (a fire door and the double doors leading to the office). But overall, it looks like my window & door guy is cheaper. He's also told me that prices are going up on the 24th of this month.

I also ordered my exterior door locks. I got all Schlage locks from handlesets.com. They can be ordered so that they all use the same key. That's going to be very nice. Just like everything else, ordering these things means wading through a sea of options and decisions: single or double cylinder locks? What handle type? Which finish?

Thursday, April 24, 2008

Ooo... Pretty Pictures

Here are the pictures of the roof that I promised! First, here is one of my copper roof jacks. The squirrels around here EAT the lead roof jacks right off the roof! So copper is the way to go. It's more expensive, but it's cheaper than having to replace them every 2 years or so once the squirrels have had their fill:



The next photos show different views of the completed roof:








Finally, here's a shot of the back door of the house now that it's installed. I'm in the process of priming and painting this and the entry door to the rear garage before the brick layers begin their work. That could happen as early as this Saturday!



Saturday, April 19, 2008

Roof & Exterior Doors Installed

With the plumber's installation of the roof jacks completed, I was ready for the roof to go on. I had narrowed it down to three roofers. Each bid coming in at just around $8,000 and each bidder having nothing about them to make them stand out from the rest. I went with a guy who lives across the street from a relative. he had helped my relative put a roof on a shed and seemed interested in getting it done the right way.

They worked on Thursday and Friday of this week (4/17-4/18). The roof looks good! (Pictures to come on that.) I was there most of the day on Thursday. That's when all my exterior doors were delivered. The only question I have about the roof is the ridge vent in the rear garage. It seems higher at each end than in the middle, like it's bowed or something. I need to ask him about that before I pay him.

As for the doors, here are pictures of them before installation:






I knew they were coming on Thursday so I called the framer on Wednesday to let him know. I expected that I'd have the weekend to start painting and staining the doors before he installed them. I still needed to pick out the stain for the front door and the primer & paint for the back doors.

My mom and I got up early today (Saturday) to pick up a piece of the front door moulding from the house and bring it with us to the paint store. The framer had never worked on Saturday at my job before, but alas, he was there this morning installing the doors! That's a good thing, don't get me wrong. But it meant that I couldn't paint all the doors and door frames before they went up. While it's not the end of the world or anything, I can't water seal the bottoms of the door frames to prevent rot like I would have preferred.
Since the doors have been delivered and installed about 3 weeks sooner than I had planned, I now need to cirlce back with the brickyard and the brick layers to see if they can fit me in earlier than expected.

Wednesday, April 2, 2008

Doors and Bricks

I put down a deposit of $2,000 on the bricks today. The total bill is right at $9,700. They're already starting to accummulate my bricks in their yard.

I also ordered my two remaining external doors today: the patio door and the side entry door for the rear garage. That total came to $984! Everything you spend on a house seems to be on the order of either $1,000 or $10,000... I went to the vet to pick up medicine for the dog the other day, and the total was $5. I thanked the lady and said how great it felt to pay a total that's less than a thousand dollars! :)

Yesterday, I visited my second plumbing supply company to decide on fixtures. It took over four hours. Mostly due to the salesman who had lots of helpful info to share on everything from kitchen sinks to tubs. The total estimate was (are you ready for this?) $9,600! Oh my! And that doesn't include the kitchen sink or the kitchen faucet. We ran out of time.

My plumber hasn't started the rough-in yet. He said he might start on Tuesday. It has rained off and on over the past couple of days. A really good downpour yesterday afternoon. My felted roof leaks in the kitchen right in front of the refrigerator slot.

Sunday, March 23, 2008

Felt on the Roof

The framers finished the plywood and felt on the roof of the house this Friday (3/21). They also put the housewrap on the house. Now it's ready for the other subs to come do their rough-ins. My AC guy will call Monday morning to let me know what day he can start. It looks like the plumber will come in after him. And my electrician is hoping to get in there this Friday and Saturday. We'll see if that all pans out...

They still need to put the roof and the wrap on the Garage. The windows will be delivered this Tuesday, because that's when the framer said he'd be ready for them. I paid the framer his first $10,000 on Friday.

I went to Lowe's this week to buy all the wiring my electrician told me to get. Total cost: $1,800!

I've been looking again at front entry doors. I can get one for around $1,800 - 2,000, but it doesn't have the window configuration I like. It is however, narrow enough. I can't have two 36" doors. I need more like 32". The ones with my preferred windows are too wide (and too expensive at $46,00)!

I've got 2 insulation bids. Both around $9,000. I have one roofing bid so far, with another one scheduled to come out and measure this week.