Thursday, May 7, 2009

Tiling Update

Two of the bathrooms are completely tiled and grouted, as well as the laundry room. The master bath floor is almost tiled. I ran out of 12in tiles and had to order more. I'm picking them up today. Yesterday, we started tiling the spa tub deck. That's excrutiating because almost every tile needs to be cut to fit.

The plumbers are supposed to come out today and install some toilets and sinks for me.

Also yesterday, we finally unpacked the refrigerator and found some bad news: the top corder looks like it was beaten up in shipping. The metal body and the door are badly bent, and when you open the door you can see the damage continues inside. I had the appliances delivered from Best Buy at the beginning of the year so I would know how big to have my cabinet openings built. I know that I should have checked them all thoroughly before now, but other work was occupying my time. I'm hoping they don't give me a lot of trouble trying to exchange it. I still have a house full of electronics to buy, and they'd be saving a good customer by accomodating me.

No comments: