So it's been a week since I added an entry, huh? Let's see what I can remember:

The electrical inspector came back on Wednesday or Thursday, and he was a jerk about some stuff. I wasn't there, but my electrician was (he was working on the outside trim at the time). The inspector was an older gentleman who complained about everything from having to step up too high to get into the house to several electrical issues. These included the need for deeper gang boxes wherever there were three wires going into a single gang switch box, an additional outlet under my bay window by the patio, and some additional stuff he wanted to see done in the breaker box.

I had read somewhere that code requires an electrical outlet for every 12 feet of wall. However, who knew that they'd be butt-heads about it even when the 12 feet consists of a bay window that stretches from floor to ceiling. When my electrician told him there wasn't room for one under the window, the inspector told him I'd just have to cut a notch in my floor trim to make room for it. Yeah, that's attractive...

The trim work has progressed to the front of the house. One gable is now done (see photo below). The other gable looks to be the only thing left on the house. My friend is moving slower than he predicted because the guy he assumed would help him has dumped him for another job at the moment. The garage is next to be trimmed. I had to return the Durock sheets I bought from Home Depot in order to get the Hardie Backer (from Lowe's) that he really needs.




I also returned the two 8-inch round columns I had bought. The tops would have extended out in front and behind of the header around my patio. I didn't think that would look good. So I special ordered two 6-inch square ones on Monday. These are made of fiberlgass like the round ones were.

I got my quotes for interior doors this week. The first one was from the door & window place. He came out to measure first. The total is around $3,200. Next, I took his list to Home Depot and Lowe's to get comparisons. It's hard to compare every door as apples-to-apples because two of them are different (a fire door and the double doors leading to the office). But overall, it looks like my window & door guy is cheaper. He's also told me that prices are going up on the 24th of this month.

I also ordered my exterior door locks. I got all Schlage locks from handlesets.com. They can be ordered so that they all use the same key. That's going to be very nice. Just like everything else, ordering these things means wading through a sea of options and decisions: single or double cylinder locks? What handle type? Which finish?

Friday, June 6, 2008

Bye-Bye Brick Layers

They managed to finish the second gable on Wednesday, but they didn't start the acid wash as promised. When I called, he said they were waiting for all bricks to be done before starting the wash. So they did the wash on Thursday, along with taking down their scaffolding and hauling their tools & equipment away. That morning before they got there, I noticed a window in the front was cracked. This was the last area they worked.

I told the son about the broken window and the crooked and chipped address number. He said I'd need to wait until the dad got there to talk about the money stuff. After a couple of cycles of me coming & going and missing the dad, I finally caught up with him. I told him the window was going to cost $200 to replace and that I needed him to pay $90 for a replacement address block. He agreed to both. We settled up and I paid him everything I owed minus $200, which I will pay when he comes to install the replacement address block. His son wasn't too happy with me for wanting to withhold money, but $200 out of $13,000 is something he's just going to have to get over.

I also had to ask him about the acid wash he was doing. My mom and others had lead me to think they would get all spots of mortar off the bricks. So my expectations were higher than I was seeing. They were using an acid solution on a scrub brush with a long handle. It got the dust and maybe some mortar off, but there are still many spots. I expected they would scrub with a wire brush by hand. My friend Matt (my electrician) said what they were doing is all any of them do.

Boy, I hate the conflict parts of this job! When I pointed out to the son that the address block was chipped, he claimed they often come like that and the damage occurs during shipping. Umm, no. I had taken it out of the box and thouroughly examined it. So I had to contradict him. I don't like to essentially call people liars, but geez...

I'm thankful that his dad admitted it was not broken when they got it out of the box. Also, the son put up an argument about me withholding money. I said I would withhold $500. He had a strong reaction. I told him he was going to have to work with me here. There was still labor to do, and I needed some assurance that they'd be back to do it. He gave the usual arguments that they'd be right back to do it as soon as I called. (And maybe they would have.) But I still need some assurance. So we settled on the $200.

So the bricks are done and the scaffolding is gone! That leaves a lot of cleanup to do. There are bricks, mortar, and other debris everywhere. I had my friend Tim come over yesterday evening and help me gather all the broken bricks into a pile. It's a start!

My friend Matt is also working on the vinyl trim on the outside. They worked their fisrt full day on Thursday. He and his brother-in-law finshed underneath the patio and the eaves across the back and a ways up the sides. They're supposed to come back on Tuesday to continue.

I called the parish today about the electrical inspection since Matt can never get a straight answer from his local electrician boss. The boss claims he called in for the rough-in inspection, but the parish government says they haven't gotten a call. So someone's either screwing around with me, or they're incompetent, or both. It's been about three weeks and I'm getting tired of this run-around. I need to move past the elctrical inspection to the framing inspection so I can get the insulation. I have calls in to Matt asking him to get to the bottom of it.

Also today, the sheetrock guy went over to put up the rock where I am going to sound-proof. I haven't been over there today to see how it looks. I'll pass by tonight when I go get the two columns I'm going to need for the back patio.

The columns are a bit of their own story. My plans call for three 6-inch wooden or fiberglass columns. I want fiberglass, and all the local stores carry is 8-inch columns. That's fine. And my friends tell me that I don't need three of them. That one will do, but I might want to put two. The framer agrees. But I'm sure the parish will balk at that because it's different than what's on the plans. So to head that problem off, I'm getting the engineer who did my wind load certificate to write me another letter with his stamp that approves of the change.

Well, that's my brain dump for today. I hope you enjoyed it as much as I did! :) More pictures to come soon.

Tuesday, June 3, 2008

I Just Want to Complete One Thing!

I have a to-do list of items that need to be completed before they insulate. We worked all day Saturday completing most of two items, but there was just a little bit more to be done on both! So we had to come back Monday evening to continue. I did finish one item (lowering all outlets and wood backing for the living room TV), but there's STILL a little more to do with decking the area above the front garage with plywood!

I would feel so much better if I could go over there and finish one project before I left. Everything always takes 10 times longer than I estimate, and there's always one piece of something that we don't have with us in order to complete the job. Oh well, at least I'm making progress. Most of what's left is running last-minute wires someplace or adding more wood blocking behind where sheetrock or viny trim will be.

Speaking of vinyl trim, my friend was planning to come and start that job today. But at the last minute we thought about how acid-washing the bricks would affect the vinyl. So he's waiting an extra day. Yesterday, the brick layers didn't show up. I don't know why. Hopefully, they will be there today to finish the job and do the acid-washing.

The electrical inspection that was scheduled for today got pushed back to tomorrow as well. So it's doubtful that I'll get that and my framing inspection by Friday. That pushes my insulation back again. The sheetrock for the walls that will be sound-proofed is on-site. We're debating whether to do anything to the bowed studs to straighten them until the framing inspection is complete. I don't want to give anyone reason to give me trouble.

Thursday, May 29, 2008

Installed Stove Exhaust Vent

Today, my dad and I cut the hole and installed the ventilator cap on the roof for the stove exhaust. I'm rather proud of myself! It's the first time I've ever done anything like that. I hope it rains before the insulation is sprayed so I can be sure it's not leaking...

In other news, the electrical inspector apparently came by and saw a few things he wanted done differently. So my electrician was there today to finish those items. The inspector is scheduled to come back on Tuesday. My electrician is also going to do my exterior vinyl trim. That should be done between Monday & Thursday of next week. So assuming I can get the framing inspection and the sheetrocking done, I can have the insulation done next Friday.

Here are some photos of the stove exhaust cap on the roof, and one of the brick layers finishing the garage (from yesterday):