I'm trying to finish up any other work that will make a mess in the bedrooms before I call for the carpet. I got the dresser home, and we've painted it. Before I fix it to the wall in my closet, I'm installing shelves above it. I've finsihed the shelves in my broom closet so that I can start putting things away instead of leaving them strewn about on the master closet floor.
It's surprisingly fulfilling to be installing the shelves. Finally, it looks like it can be lived in! I can put stuff in it's place!
I'm also planning to complete a bulk of the work on the master bathroom wall tile before I get the carpet. Most of the tile is being stored in the master bedroom right now. So I want to get a good bit of it on the wall and out of the way. I also know that I'm going to be tracking through my bedroom a lot to get to the bathroom while I'm doing the job, so I want to avoid making a mess on the new carpet.
The nail holes in the baseboard are filled in the bedrooms, and they have been painted over.
Tuesday, December 1, 2009
Friday, November 20, 2009
Filling Nail Holes
This week, I've started filling the nail holes in the baseboard trim. I'm starting in the bedrooms so they're ready for the carpet. I still have to get the dresser home and paint it for the master closet before the trim can be installed in there.
I don't know if I mentioned this before, but I've also setup my DSL modem and network router in the past seeral days. I can now surf through my own connection rather than bum off an unsecured neighbor's! I've started finalizing the layout of all the components in my structured wiring panel and putting some of those cables in place.
This week, I also finished installing the in-ceiling speakers. The last ones I did were the master bedroom and the office. I'm in the process of hanging the left, right, and center speakers around the TV.
I don't know if I mentioned this before, but I've also setup my DSL modem and network router in the past seeral days. I can now surf through my own connection rather than bum off an unsecured neighbor's! I've started finalizing the layout of all the components in my structured wiring panel and putting some of those cables in place.
This week, I also finished installing the in-ceiling speakers. The last ones I did were the master bedroom and the office. I'm in the process of hanging the left, right, and center speakers around the TV.
Monday, November 16, 2009
Legally Done!
I just picked up the "Certificate of Completion" from the parish building inspection office. This completes the process and allows me to live in the house! I'm still going to wait for carpet in the bedrooms before I move in, but that should come very soon. I've already picked out the color, and I need to call for the guys to come out and measure.
I've ordered the bed and nightstands I want for my room. They will come unfinished and the cabinet company (Wood-n-Things) will finish them for me. If that takes longer than the carpet installation, I can still bring my current bed over and sleep in one of the spare rooms until my bedroom is setup.
I've ordered the bed and nightstands I want for my room. They will come unfinished and the cabinet company (Wood-n-Things) will finish them for me. If that takes longer than the carpet installation, I can still bring my current bed over and sleep in one of the spare rooms until my bedroom is setup.
Tuesday, November 10, 2009
Passed Final Inspection!
This morning, the parish building inspector signed off on my final inspection!! No silly items to hold me up. I can now go pick up my occupancy certificate.
It's a very happy day!
Also, the window shades were installed today. One shade (that was supposedly cut to size by the Lowe's employees) wasn't cut at all. I need to bring it back.
I've also started searching for the carpet colors I want.
It's a very happy day!
Also, the window shades were installed today. One shade (that was supposedly cut to size by the Lowe's employees) wasn't cut at all. I need to bring it back.
I've also started searching for the carpet colors I want.
Friday, November 6, 2009
Lots of Final Details - Range Hood, Floor Trim, Sofa
Many of the small (and not so small) things are coming together now. Last week on Tuesday, the cabinet guys came out to put the fridge cabinet and work desk in place. That allowed me to move the refrigerator in place. So no more fridge in the TV room! They also started putting the trim moulding at the top and bottom of the cabinets. Thursday and Friday, the trim carpenters were there to install the base moulding throughout the house. They were also working on the three pocket doors, and they discovered I had the wrong size doors. They were too wide for the openings. So new ones have been ordered. Door knobs and door stoppers are also in place.
I have a lot of base moulding left over. About 15 strips. I can't return them because they're already painted. I'm not happy about that because whichever vendor did the estimating should have had a number closer to reality than that. But the material wasn't TOO expensive, so I guess it could be worse.
I also finished the backsplash on one kitchen wall this week. It's grouted and sealed. That allowed me to install the range hood. As far I as know, I'm now ready for the final inspection! I tried calling for it today but ran into government thinking... They were booked for today, and I couldn't have them come out Monday due to other commitments. They don't schedule out past one work day so I need to call back Monday in order to schedule it for Tuesday...
Tuesday will also be the day for the installer to put up all my window shades. I'll finally be able to take the cardboard and black plastic sheeting off all the windows!
My office furniture should be coming from Dallas on Monday or Tuesday. I'm in the final stages of picking a stain color for that.
Oh, and I almost forgot: my sofa and love seat were delivered last Tuesday! I hosted my first movie night with some friends on Sunday night. We watched Star Wars (episode IV). It was really cool having people over to my own place.
Here are some of the latest pictures. The only thing outdated here is the wall behind the stove. I don't have a pic of the range hood yet.


I have a lot of base moulding left over. About 15 strips. I can't return them because they're already painted. I'm not happy about that because whichever vendor did the estimating should have had a number closer to reality than that. But the material wasn't TOO expensive, so I guess it could be worse.
I also finished the backsplash on one kitchen wall this week. It's grouted and sealed. That allowed me to install the range hood. As far I as know, I'm now ready for the final inspection! I tried calling for it today but ran into government thinking... They were booked for today, and I couldn't have them come out Monday due to other commitments. They don't schedule out past one work day so I need to call back Monday in order to schedule it for Tuesday...
Tuesday will also be the day for the installer to put up all my window shades. I'll finally be able to take the cardboard and black plastic sheeting off all the windows!
My office furniture should be coming from Dallas on Monday or Tuesday. I'm in the final stages of picking a stain color for that.
Oh, and I almost forgot: my sofa and love seat were delivered last Tuesday! I hosted my first movie night with some friends on Sunday night. We watched Star Wars (episode IV). It was really cool having people over to my own place.
Here are some of the latest pictures. The only thing outdated here is the wall behind the stove. I don't have a pic of the range hood yet.


Labels:
appliances,
backsplash,
interior trim,
kitchen,
sofa,
tile
Saturday, October 24, 2009
Waiting for Final Backsplash Tile, Painting Baseboard
While I'm waiting for the rest of the beige tile to come in for the kitchen backsplash, we spent some evenings this week painting base moulding. (Thanks go out to Kenny for helping with that!) I called the trim carpenter to start lining up his return visit to install it. He said that late next week would be the earliest he could plan on.
I had less bas moulding than I remembered. This is probably because we already painted some of it and he installed it already in the bedrooms. I decided to put two coats of paint on the base since it will be prone to scuffing and scraping down next to the floor.
The cabinet company is ordering my office furniture soon. (I thought it was already on order, but that's the way it goes sometimes...) Torrie came out to finalize a few details this week and get a deposit from me. She's not sure if she'll give the job to the same carpenter in Dallas that built my kitchen cabinets because he's been so backlogged with work lately. She may assign it to another wood furniture company they deal with that has started to do more custom work. I'm also looking at getting the dresser to go in my master closet. I need to tell her tomorrow to go ahead and order that piece.
I've been visiting a lot of furniture stores recently to look for a bed with nightstands, a coffee table, an end table, a kitchen table, and possibly an entertainment center/pedestal. Ugh, a lot of decisions in all of that. I plan to visit one more place tomorrow. It's across the river close to my cabinet makers. I'll stop by their shop again to look at their tables and other things.
I had less bas moulding than I remembered. This is probably because we already painted some of it and he installed it already in the bedrooms. I decided to put two coats of paint on the base since it will be prone to scuffing and scraping down next to the floor.
The cabinet company is ordering my office furniture soon. (I thought it was already on order, but that's the way it goes sometimes...) Torrie came out to finalize a few details this week and get a deposit from me. She's not sure if she'll give the job to the same carpenter in Dallas that built my kitchen cabinets because he's been so backlogged with work lately. She may assign it to another wood furniture company they deal with that has started to do more custom work. I'm also looking at getting the dresser to go in my master closet. I need to tell her tomorrow to go ahead and order that piece.
I've been visiting a lot of furniture stores recently to look for a bed with nightstands, a coffee table, an end table, a kitchen table, and possibly an entertainment center/pedestal. Ugh, a lot of decisions in all of that. I plan to visit one more place tomorrow. It's across the river close to my cabinet makers. I'll stop by their shop again to look at their tables and other things.
Tuesday, October 13, 2009
Tiling the Backsplash
I've worked on the tile backsplash in the kitchen for several days now, totalling about 21 hours. It's a much slower process than I assumed it would be. I guess I should have expected this because of how long it took to tile the floors. But what makes it even slower is that each and every tile needs to be cut. This is due to the pattern I've chosen to use and the cramped, oddly-shaped space between the counter and the cabinets. A space that's also disrupted by the window and the rectangle "frame" desgin that's going above the stove.
I'll have pictures soon. So far, I'm only working on the one wall with the stove. I want to finish that first and then grout it so I can hang the range hood. At this point, I've finsihed under the cabinets from the fridge to the little window. I still have to finish the whole space where the range hood will be.
I'll have pictures soon. So far, I'm only working on the one wall with the stove. I want to finish that first and then grout it so I can hang the range hood. At this point, I've finsihed under the cabinets from the fridge to the little window. I still have to finish the whole space where the range hood will be.
Saturday, October 3, 2009
Touch-up Painting
The tile I ordered for the kitchen backsplash isn't supposed to get here until next weekend. I had planned to have it earlier, and I would have worked on that this weekend. Since I couldn't, I concentrated on touching up walls and ceilings with paint. My mom's cousin also came over to patch up the sheetrock where the plumber had to run the second line. He also did small touch-ups where there were lines or defects in the original sheetrocking job.
My dad worked on the endless job of touching up the crown moulding: filling nail holes with putty, sanding, and painting over them. I touched up the walls of four rooms in the house. That leaves 4 or 5 others to go.
I also hooked up the blu-ray player to the big TV. I wanted to make sure the picture was good both when I looked it up directly to the TV and when I hooked it up via the long HDMI cable I have running over to the media closet. In both cases, it worked great! Good thing, because it would be really difficult to run a new cable now. The foam insulation in the attic makes it very difficult to get to the conduit running down that wall.
I also sealed the grout in the TV room and foyer tile, along with 4 closets that hadn't been sealed yet. With the TV and blu-ray player in place, I got to do this job while Star Trek II played on the big screen! Ahh, life's simple pleasures...
My dad worked on the endless job of touching up the crown moulding: filling nail holes with putty, sanding, and painting over them. I touched up the walls of four rooms in the house. That leaves 4 or 5 others to go.
I also hooked up the blu-ray player to the big TV. I wanted to make sure the picture was good both when I looked it up directly to the TV and when I hooked it up via the long HDMI cable I have running over to the media closet. In both cases, it worked great! Good thing, because it would be really difficult to run a new cable now. The foam insulation in the attic makes it very difficult to get to the conduit running down that wall.
I also sealed the grout in the TV room and foyer tile, along with 4 closets that hadn't been sealed yet. With the TV and blu-ray player in place, I got to do this job while Star Trek II played on the big screen! Ahh, life's simple pleasures...
Monday, September 28, 2009
Office Cabinets Ordered, Backsplash Tile Chosen
On Tuesday of last week (9/22), I finalized everything for my office cabinets and put in the order! Torrie came out to get all the measurements and talk through the final details. I'm excited about the office. I like the J-shaped desk configuration because it puts everything conveniently at arm's length. Here's a Google Sketchup version of what I ordered. These images show only the cabinets and the drawers that will be suspended under the countertop:




I also settled on the tile for my kitchen backsplash. I placed the order today, so hopefully I'll have the material by this weekend. I may take a whole day off work Friday and start the project. This is the last big project for me to do inside the house. Then I can mount the range hood and call for the final inspection!
I'm still making some decisions about drawer cabinets for the master closet, cabinets in the laundry room, and whether or not to let the cabinet people make wooden panels for the front of my kitchen island.
Thursday, September 17, 2009
Water Pressure Fixed, Dishwasher Installed
The plumbers were at the house Tuesday and Wednesday this week taking care of odds and ends as well as running the new line from the attic to address the low hot water pressure.
They put the dishwasher in place and hooked it all up. Now that it's in the hole, I have to complete my idea of putting the legs back together with the brackets we made. It's going to be a tight squeeze getting my hands under there. I'm going to try it tonight. We can't test the unit until the legs are back together and the top is screwed to the wood plate to keep it from jumping around.
On the spa tub, they hooked up the replacement control pad and attached the air pump. So we were able to fill the tub and run it with the bubbles for the first time! That was cool. The pump was loud, but that may change. I still have to complete the cement board and tile panels around the front of the tub and create a access door to close off the opening in the closet that provides access to the pump. So I can probably do some sound insulating things there to muffle the noise. I had forgotten a feature I learned about early on: that the air pump comes back on a few minutes after you turn it off. It waits to give the water time to drain, and then it comes back on to dry any remaining water out of the conduits. This is supposed to keep mold and bad smells from creeping in.
Regarding the new hot water line, the guys started the work the first day, but ran into doubts about whether the new line to the master bath would fix the problem. They cut the sheetrock in the wall and started to cut pipes, etc. Then they started asking me if I had any more pictures of the pipes behind walls in other bathrooms. Hmm... I started to get a little worried! It turns out they were just being cautious. It was their boss who had told them where to run the line, but they weren't sure why.
They came back the next day having gotten a deeper explanation from him. Apparently, there's a problem with lines running under the slab between the half bathroom and the laundry room fixtures. We know this because the laundry room sink is the first place you begin to see a difference in hot and cold water pressure. But it's not really obvious until you run both the laundry room sink AND another fixture in the master bathroom, which is downstream. So, the course of action chosen was to run another hot water line directly from the tank in the attic to the master bathroom where it joins up with the existing system again. Here's the diagram:
They put the dishwasher in place and hooked it all up. Now that it's in the hole, I have to complete my idea of putting the legs back together with the brackets we made. It's going to be a tight squeeze getting my hands under there. I'm going to try it tonight. We can't test the unit until the legs are back together and the top is screwed to the wood plate to keep it from jumping around.
On the spa tub, they hooked up the replacement control pad and attached the air pump. So we were able to fill the tub and run it with the bubbles for the first time! That was cool. The pump was loud, but that may change. I still have to complete the cement board and tile panels around the front of the tub and create a access door to close off the opening in the closet that provides access to the pump. So I can probably do some sound insulating things there to muffle the noise. I had forgotten a feature I learned about early on: that the air pump comes back on a few minutes after you turn it off. It waits to give the water time to drain, and then it comes back on to dry any remaining water out of the conduits. This is supposed to keep mold and bad smells from creeping in.
Regarding the new hot water line, the guys started the work the first day, but ran into doubts about whether the new line to the master bath would fix the problem. They cut the sheetrock in the wall and started to cut pipes, etc. Then they started asking me if I had any more pictures of the pipes behind walls in other bathrooms. Hmm... I started to get a little worried! It turns out they were just being cautious. It was their boss who had told them where to run the line, but they weren't sure why.
They came back the next day having gotten a deeper explanation from him. Apparently, there's a problem with lines running under the slab between the half bathroom and the laundry room fixtures. We know this because the laundry room sink is the first place you begin to see a difference in hot and cold water pressure. But it's not really obvious until you run both the laundry room sink AND another fixture in the master bathroom, which is downstream. So, the course of action chosen was to run another hot water line directly from the tank in the attic to the master bathroom where it joins up with the existing system again. Here's the diagram:
The old line from the laundry room to the master bath is still hooked up. So the hot water system is kind of weird. It's being supplied at two points. One thing I need to keep an eye on is: assuming there's a kink in the line between the half bath and laundry room, it COULD develop into a leak years down the road. So I could potentially have a leak under the slab that's not near the outside perimeter. Meaning it won't be accessible to fix!