The tile I ordered for the kitchen backsplash isn't supposed to get here until next weekend. I had planned to have it earlier, and I would have worked on that this weekend. Since I couldn't, I concentrated on touching up walls and ceilings with paint. My mom's cousin also came over to patch up the sheetrock where the plumber had to run the second line. He also did small touch-ups where there were lines or defects in the original sheetrocking job.
My dad worked on the endless job of touching up the crown moulding: filling nail holes with putty, sanding, and painting over them. I touched up the walls of four rooms in the house. That leaves 4 or 5 others to go.
I also hooked up the blu-ray player to the big TV. I wanted to make sure the picture was good both when I looked it up directly to the TV and when I hooked it up via the long HDMI cable I have running over to the media closet. In both cases, it worked great! Good thing, because it would be really difficult to run a new cable now. The foam insulation in the attic makes it very difficult to get to the conduit running down that wall.
I also sealed the grout in the TV room and foyer tile, along with 4 closets that hadn't been sealed yet. With the TV and blu-ray player in place, I got to do this job while Star Trek II played on the big screen! Ahh, life's simple pleasures...
Saturday, October 3, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment