Saturday, October 24, 2009

Waiting for Final Backsplash Tile, Painting Baseboard

While I'm waiting for the rest of the beige tile to come in for the kitchen backsplash, we spent some evenings this week painting base moulding. (Thanks go out to Kenny for helping with that!) I called the trim carpenter to start lining up his return visit to install it. He said that late next week would be the earliest he could plan on.

I had less bas moulding than I remembered. This is probably because we already painted some of it and he installed it already in the bedrooms. I decided to put two coats of paint on the base since it will be prone to scuffing and scraping down next to the floor.

The cabinet company is ordering my office furniture soon. (I thought it was already on order, but that's the way it goes sometimes...) Torrie came out to finalize a few details this week and get a deposit from me. She's not sure if she'll give the job to the same carpenter in Dallas that built my kitchen cabinets because he's been so backlogged with work lately. She may assign it to another wood furniture company they deal with that has started to do more custom work. I'm also looking at getting the dresser to go in my master closet. I need to tell her tomorrow to go ahead and order that piece.

I've been visiting a lot of furniture stores recently to look for a bed with nightstands, a coffee table, an end table, a kitchen table, and possibly an entertainment center/pedestal. Ugh, a lot of decisions in all of that. I plan to visit one more place tomorrow. It's across the river close to my cabinet makers. I'll stop by their shop again to look at their tables and other things.

Friday, December 26, 2008

Still Painting Moulding, Trim Work Next Week

My trim carpenter was supposed to start on the day before Christmas Eve, which was Tuesday of this week. He had to push back until this Monday. That's given us time to paint more moulding. We've almost finished all the crown. I also painted a few lengths of baseboard and casing in case he needs them right away.


We're running out of space to put the painted strips. We've been stacking them in the front garage in such a way that there's a spacer between each layer and the moulding on top doesn't touch the one underneath. One sticking point now is that the trim guy and the garage door installer are coming on the same day. The garage door guy needs the garages cleared out to give him room to install the rails, etc. And the trim guy won't be ready to use all that crown on his first day (he's installing the doors first). So for that day, we're going to need to move all the painted crown somewhere else.





As you can see from the photos, these strips are each 16 ft long. We've used every space that would fit them to lay them out and paint them.

Friday, November 21, 2008

Moulding Delivered, Garage Doors Ordered... Again!

My base and crown moulding was delivered yesterday. I had gotten two bids: one from the supplier my trim carpenter likes to work with and one from my window and door supplier. The door supplier was a bit cheaper on some items, but I preferred to use the supplier that my carpenter was accustomed to. I thought it would help the job to go smoother if he already had lines of communication with them. So I asked them if they could match the prices from my door supplier, and they did.

Also yesterday, I placed the order for my garage doors with another contractor. This was a guy that my trim carpenter recommended. He's an independent company. He was cheaper than two other local companies I checked with, and he works with Clopay doors like I originally wanted from Home Depot. Clopay has colors that more closely match my vinyl windows. The guy met me at the house to measure and confirm what I wanted. I paid a deposit of $1,500. He says the doors will take 3 weeks at the most to come in.