Wednesday, July 16, 2008

Garage Insulation Blown. Taping Sheetrock.

There's a lot more sheetrock scrap than I predicted. There are at least 4 piles of the stuff all around the yard. I'm planning to have a trash trailer or a dumpster brought to the site so we can load it up and they can haul it away. We've usually just brought trash to the dump ourselves. But there's enough of it here to make it worth the $175 - $285 for a container.



They have worked 2 half days at taping all the sheetrock. Today they start working whole days because their other job is finished up. Woody, the guy who seems to be the supervisor working with them, tells me that the end of today should be the half-way point in their work. So far, it looks good.






We finished blowing the insulation into the garage walls and attic at 10PM on Monday night. That ended a 4-day marathon of work on that project. I hope I never have to do that again!



Blowing in the attic was far easier than the walls. Just point and shoot! The walls took so much time attaching the netting and then having to hold the hose just-so. And there was so much starting and stopping for each stud bay.

I took yesterday evening off from working at the house. Except for closing up the place and meeting a friend of mine to talk about doing the finishing of the garage door arches, I didn't work over there.

Monday, July 14, 2008

Rear Garage Insulation

While the guys were hanging the sheetrock in the house, my dad and I got to work insulating the rear garage with blow-in fiber material from Home Depot.





Yes, that's me! See, I really am capable of physical labor!

This material is like the lint you clean from the filter in your clothes dryer mixed with random pieces of newspaper and plastic scraps. You break it up from the bag into a hopper, and it blows though the hose. It's dry, so it doesn't stick in the walls on its own. You need netting installed across the front of the studs to hold it in.

Like everything else, this has taken much longer to complete than first anticipated. As I write this, we're not done yet. If you buy enough material from Home Depot, they let you rent the machine for free. They say they don't want you to keep it longer than 3 days, but that didn't sound like a hard-and-fast rule. Just a request. I picked it up Friday afternoon, so this afternoon would make 3 days. I'll bring it back tomorrow if we can finish tonight.

The stuff is dry and fluffy, so it gets everywhere. In the picture above, you can see it coating my arms and clothes. The gear on my head is keeping it from my eyes, nose and mouth. The material is treated with a chemical. I presume it's to make it fire retardant. But if you have any open cut, blister, or sore, it burns like crazy on contact.

So far, we've completed all except the right-hand wall. Blowing in the attic should go mch quicker than the walls since we don't have to stop to hang netting and I don't have to hold the hose over my head. I'll be in the attic blowing down in between the rafters.

The stuff seems really good at sound insulation. I hope it's good at keeping some of the heat out. I know I'm not cooling the inside of the garage, but it would be nice for it not to be 100 degrees in there.

On the Sheetrock Front...

The hanging is done, and the next crew is starting the next stage today. I know they start with taping, and I guess the next step is called floating? In any case, I'm told they're going to start after lunch.


Monday, July 7, 2008

Post-Insulation, Pre-Sheetrock

The insulation is done. The sheetrock is scheduled to be delivered on Tuesday, with the hanging work starting on Wednesday. In the meantime, we've spent a lot of time cleaning the foam overspray out of the attic. The sand-like residue is everywhere! We scraped and swept everywhere on the flat deck up there. We also did a lot of scraping on the beams and supports, but there is more work to do if I want to get it completely clean.

We've also begun finding wall studs that are bowed and correcting them. This will make for walls that are more straight and level. I've also got to finish running speaker wire to a few rooms, and mark on the floor where all the outlets and switches are so that I can make sure none get accidentally covered by sheetrock.

My brick layer came back to hang the new address number. This time it's level and un-chipped. It looks good!

Thursday, July 3, 2008

Walking in a Winter Wonderland

The insulation guys finished up day three today of what should be a 4-day job. It's coming out great. I have learned a few things along the way about the spray foam insulation. First, there is a misty overspray that comes from their work. Foam particles land EVERYWHERE and then expand, like tiny styrofoam spheres. The stuff coats everything. It's not a problem because the guys were really good about covering everything with plastic(windows, doors, tools, equipment, etc.). The other thing is that the foam expells fumes after it's applied. My vision was hazy after spending much of the first day on-site. Venting the house is important.



I used a company called Energy and Comfort Solutions. The crew is Spanish-speaking. They know only a little English. That has caused at least one minor problem. I asked them if they could save a particular room until last because there were still some things I was considering installing in the walls. They said yes, but they did that room first! It turns out it wasn't that important, but still...



This company offers a caulking package where they caulk seems everywhere (between two studs, between the sill plate and the slab, around window & door headers, etc.). It's another thing to help with air-tightness. They've done a good job with that.



I also have to thank the management of the company. I have a bathroom with bedrooms on either side, and I'm concerned about noise from the bathroom spilling into the bedrooms. I purposely designed it so that the plumbing for the shower is NOT in the wall that borders a bedroom, but I still wanted to add something in the walls to absorb some sound. I had not planned to put spray foam there because it's more expensive than other materials. I called them to ask what other material they thought was second-best at absorbing sound. He offered to just have them spray the walls while they were there at no cost! I hadn't had sheetrock installed on one side of the walls, so I had to rush over to staple some tyvek material on one side of each wall to provide backing where they can spray. They are going to do this tomorrow. Afterward, I'll peel off the Tyvek and the foam ought to stay in place.



Here are a few pictures from Day 2. This doesn't show all they finished today:





Tuesday, July 1, 2008

First Attic Insulation Photos






The pictures above are from the first day of insulation work. They're done with about 3/4 of the attic. The last photo is just to show the outside now that the trim work is done.

Thar be Foam in These Here Rafters!

Okay, so I'm not sure how to translate that declaration into pirate-speak (or is that gold-prospector-speak?). But the message is an exciting one: they're beginning to spray in the foam insulation today!

I got word late yesterday that they could start the process today. I'm still working on some of the bowed studs in the exterior walls, but it's gonna take them all of today and some of tomorrow to finish the roofline (the roof rafters). By the time they start spraying downstairs, I'll have all the studs evened out.

They arrived at about 8:40 this morning. The prep work took a while, and they started spraying at around 10:30. I left for lunch and to get some work done for my employer. I'm headed back out there now, and I hope to get some good pictures.

Friday, May 23, 2008

Rain Delays, and Entering Home Stretch Before Insulation

I went by to take pictures today, but my camera batteries were out! So I'll try to go back after work today.

It rained all day yesterday after about 11AM. I went by in the morning. The guys were there setting up bricks around the back garage. I reminded them about how I want a solier course up each side of the front gables. I assume they understood. It sounded like he was already aware of it. They didn't lay any bricks. They must have left after setting up around the garage. It did not rain today, but they hadn't been back today as of 11:30 when I went by.

The insulation guy called to see if I'm still on course for next Friday (5/30) to start. We talked about what I have to get done before then:

- Electrical & framing inspection
- Vinyl in the overhangs, patio and porch
- Hole through the roof for stove vent
- Sheetrock on one side of each wall that will be sound-proofed
- Running remaining alarm wires (mostly needed before sheetrocking)

I've got one quote on the vinyl overhangs, etc. I can't get my other preferred contractor to call me back because he's busy. My friend who did the electrical work said he would quote on the job also. The insulation guy told me they can come out and do the walls on one day and come back to do the roofline another day. This would give me more time to get the overhangs done.

So that leaves the inspections and the sheetrocking to get done so we can proceed with the walls. I spoke to my sheetrock guy today. He indicated he could start the full job next week. He also said he could do the one side for the soundproof walls. That was no problem.

For my garage door frames, since no one seems to know how to do them with vinyl, it looks like one of my last options is to go with stucco here. Uggh! I do not like stucco and that's one thing I was glad that I wasn't going to have. My friend says they use a concrete substance that makes it completely hardened against dents and what have you. Looks like I need to start calling stucco contractors!