Monday, July 7, 2008

Post-Insulation, Pre-Sheetrock

The insulation is done. The sheetrock is scheduled to be delivered on Tuesday, with the hanging work starting on Wednesday. In the meantime, we've spent a lot of time cleaning the foam overspray out of the attic. The sand-like residue is everywhere! We scraped and swept everywhere on the flat deck up there. We also did a lot of scraping on the beams and supports, but there is more work to do if I want to get it completely clean.

We've also begun finding wall studs that are bowed and correcting them. This will make for walls that are more straight and level. I've also got to finish running speaker wire to a few rooms, and mark on the floor where all the outlets and switches are so that I can make sure none get accidentally covered by sheetrock.

My brick layer came back to hang the new address number. This time it's level and un-chipped. It looks good!

No comments: