Tuesday, August 25, 2009

Tiling All But Done!

I'm so releived to say that all I have left to do is lay a few more tiles in my pantry and then I'm done with ceramic tile for (hopefully) a very long time! I have all the tiles cut for the pantry, but I need to order one more carton because I need one more full tile to finish the job. That's okay, because I want to have a few spare tiles in case one cracks or whatever down the road.

I ordered the laminate wood that will go in my office. Eleven cartons of Brazillian Cherry from Kronotex. It matches the darker parts of my front door. I also picked up a can of stain for the office doors. My dad can start working on those during the day while I'm working.

For the front of the kitchen island, I picked up the maple plywood and 1-bys that will be used. We will have to route and cut the pieces to fit. Then I'll take them across the river to the cabinet guys to stain and varnish so it will match the cabinets.

Last night, we cut the frame of the dishwasher so that we can slide it into the hole. We didn't test the fit yet. The idea is that cutting the frame at these points will allow it to flex in the right way to get into the hole. We've got metal brackets and bolts ready to put in place after it's in that will restore the integrity to the frame.

No comments: