I called the parish yesterday to ask what needs to be completed before my final inspection. The plumber got his done last week, so the overall final is all that's left. I wanted to make sure I knew what's included in the overall final.
After we talked, he said it sounds like I'm ready. They look for final lot grading (for water drainage), and safety things like hand rails on stairs, etc. He said I don't need to have the chain link fence installed, and I don't need to have the flooring finished. Wow, I would have thought that every last detail would be scrutinized. A friend who built in another parish told me they wanted all his interior door knobs installed before they'd pass him on the final.
I still want to cover some items before I call for the inspection. I've got some outlet plates to put over receptacles and stuff like that. But maybe this last inspection won't be as big a deal as I feared.
Friday, August 7, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment