Tiling Almost Complete

Wow, it's been an entire month since my last post. In that time, I've finished tiling the kithcen floor and both hallways that connect to it. And I've grouted all that space. I'm half way done with the entry foyer, and I've done the walls behind the spa tub. I haven't grouted this yet. All I have left to tile is the TV room and the rest of the walls in the bathroom!

I did a test of my alarm monitoring service. It's a good thing I did, because they couldn't find me in their system until my installer corrected some information with them. They did see it come through when I did the test.

I'm looking forward to getting my window blinds so I can take the cardboard down off the windows. To that end, I've been visiting stores to look at brands and colors. I like the roman shades, but they're more expensive (of course). One Lowe's store wasn't much help because there was no one working who knew anything about shades. At another store, we found a lady who was very helpful. She had good decorating ideas. Lowe's also had a special going on measuring and installing for a whole house. They should call to schedule an appointment within 2-3 days. Before I make color choices for the blinds, I'm going to wait until I have an idea which furniture I'm going to buy.

The plumber is supposed to come someday next week to finish up his work. There are two toilets and the spa tub left to be installed, along with the faucets and trim on the bathtub and garage shower. Oh, and the dishwasher, too. I've been waiting to get the walls tiled behind the spa tub before calling them back. I also need to call the cabinet guys back out. Since the kitchen floor is tiled and grouted, they can finish installing the molding, thr fridge cabinet and the work desk.

No comments: