Monday, June 22, 2009

New Fridge Arrived, First Front Retaining Wall Built

On June 19 & 20, we formed and poured the first of two concrete retaining walls in my front yard. There will be a short wall on on each side of the yard between me and each neighbor. The walls will span from the end of the privacy fences to the street. We've completed the one on the driveway side of the house.

After two full days in 95+ degree heat, I have to wonder if I've lost my marbles! Why are we doing this? Well, I want to make sure that the parish can't use that as a last-minute holdup on my final inspections. Without these walls, they could see potential for rain water to run off onto a neighbor's yard. In addition, the one we just completed will help hold the edge of the driveway in over the years.

On the 19th, they delivered my new refrigerator. It's plugged in and working! So we can now stock up on water and stuff at the house without bringing ice chests all the time.

On the tiling front, I haven't done any more since I started inside the kitchen island. This evening, we're going to remove the form from the first wall and continue tiling. I'll work on the tile until Friday and Saturday, when we'll do the wall on the other side of the yard. Those are the first days we expect any kind of break from this relentless heat. And by "break", I mean that it may be in the low 90s instead of the high 90s!

No comments: