I've been busier since leaving my job than I was for months at my job! Last week and today have been a constant whirlwind.
They're continuing to make progress on the driveway. The photo below is from a couple of days ago. Since then, they've compacted crushed concrete and limestone in the back and down the driveway to the street. And also most of the circle in the front. Then they spread sand in the back and down the driveway to the front of the house. That's what the bricks will lay on, but they didn't start the bricks today like they planned. I'm guessing that the bricks weren't delivered in time. Spotty rain is expected tonight and tomorrow, so I hope they can cover where the sand is before rain does any damage to their setup.
Today, I managed to get some friends over to take some of the dirt before I had to pay to get it hauled off. The driveway guys had to split time between spreading limestone and scooping dirt into trailers with their bobcat. After that, I had time to rush home and eat lunch before going back to meet the plumber and the inspector coming to look at the hot water heater. He passed us, but only after talking like he wasn't going to because I don't have a dryer vent on the outside of the house yet. I have the vent, but I just hadn't installed it yet.
I discovered that the trim kit that came with my microwave is too big for the face of the cabinet it's supposed to go in. The cabinet guy came out today and looked at it. He doesn't see a way to make this piece work with the cabinet. A call to Lowe's and a trip to Home Depot revealed no other types of trim kits. My next step will be to Google for some generic kit that will fit.
Tomorrow morning the surveyors are coming out to take measurements for my "final FEMA certificate". I'm told that it's the same thing as the elevation certificate I already had to get, so I don't know why I need another one. But the parish wants that before they will come inspect for the temporary power meter.
My head hurts from trying to keep up with everything that's going on. But at least it means that progress is being made! I can't imagine having to work on these last few days. I would never have been able to get everything done.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment