They delivered the cabinets for the kitchens and bathrooms on Monday. They worked to install on Monday and Tuesday. There are a few pieces in the kitchen that they did not install, either because I asked them to hold off or because they need to wait until the countertops are in. Here are some pictures:
The driveway guys came this morning to start working. They staked out the horseshoe part of the front yard and dropped off some of the fabric that goes underneath everything... Then they left because it was too cold to work! I can't blame them. It was cold today. I ordered the materials for the underground drainage. I don't even want to think about how much that cost. :-( The stuff will be delivered tomorrow, and the driveway guys tell me they'll be back out to start grading everything in the morning.
Also tomorrow, the electrical inspector is coming. If all goes well, I'll get approved. And then I'm going to apply for the temporary meter permit. This will free the utility company to come hookup the power to the house before my final inspection. That will be good for at least two reasons: I can get the alarm system working to protect the appliances and other valuables I'm accumulating, and I can run the A/C to get the wood flooring I buy acclimated to the environment inside the house before I install it.
This will let me remove the temporary electrical pole just in time to get it out of the way of the driveway.
No comments:
Post a Comment