The driveway crew is on day two of their work. Yesterday, they skimmed sand out of the back and the side of the house where the driveway will go. They filled in the alley and piled some sand in the backyard. Today, they're laying the drainage pipe and basins. There's a huge pile of crushed limestone and concrete in the street waiting to be spread everywhere. They still need to skim out the front yard. Tomorrow, they should be spreading the limestone and the sand on top.
My electrical inspection passed yesterday! Immediately, the electrician filed for a temporary 30-day meter on my behalf. I needed to go and sign a paper saying I won't move in until the inspections are all done. Then I found out a few more hoops I need to jump through before I can get my meter: I need the final FEMA certificate from the surveyor (which means another trip out for them to take measurements), and I need a "temporary meter inspection" by the parish... So it looks like maybe next week sometime before I can get the meter.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment