This week, I've started filling the nail holes in the baseboard trim. I'm starting in the bedrooms so they're ready for the carpet. I still have to get the dresser home and paint it for the master closet before the trim can be installed in there.
I don't know if I mentioned this before, but I've also setup my DSL modem and network router in the past seeral days. I can now surf through my own connection rather than bum off an unsecured neighbor's! I've started finalizing the layout of all the components in my structured wiring panel and putting some of those cables in place.
This week, I also finished installing the in-ceiling speakers. The last ones I did were the master bedroom and the office. I'm in the process of hanging the left, right, and center speakers around the TV.
Friday, November 20, 2009
Monday, November 16, 2009
Legally Done!
I just picked up the "Certificate of Completion" from the parish building inspection office. This completes the process and allows me to live in the house! I'm still going to wait for carpet in the bedrooms before I move in, but that should come very soon. I've already picked out the color, and I need to call for the guys to come out and measure.
I've ordered the bed and nightstands I want for my room. They will come unfinished and the cabinet company (Wood-n-Things) will finish them for me. If that takes longer than the carpet installation, I can still bring my current bed over and sleep in one of the spare rooms until my bedroom is setup.
I've ordered the bed and nightstands I want for my room. They will come unfinished and the cabinet company (Wood-n-Things) will finish them for me. If that takes longer than the carpet installation, I can still bring my current bed over and sleep in one of the spare rooms until my bedroom is setup.
Tuesday, November 10, 2009
Passed Final Inspection!
This morning, the parish building inspector signed off on my final inspection!! No silly items to hold me up. I can now go pick up my occupancy certificate.
It's a very happy day!
Also, the window shades were installed today. One shade (that was supposedly cut to size by the Lowe's employees) wasn't cut at all. I need to bring it back.
I've also started searching for the carpet colors I want.
It's a very happy day!
Also, the window shades were installed today. One shade (that was supposedly cut to size by the Lowe's employees) wasn't cut at all. I need to bring it back.
I've also started searching for the carpet colors I want.
Friday, November 6, 2009
Lots of Final Details - Range Hood, Floor Trim, Sofa
Many of the small (and not so small) things are coming together now. Last week on Tuesday, the cabinet guys came out to put the fridge cabinet and work desk in place. That allowed me to move the refrigerator in place. So no more fridge in the TV room! They also started putting the trim moulding at the top and bottom of the cabinets. Thursday and Friday, the trim carpenters were there to install the base moulding throughout the house. They were also working on the three pocket doors, and they discovered I had the wrong size doors. They were too wide for the openings. So new ones have been ordered. Door knobs and door stoppers are also in place.
I have a lot of base moulding left over. About 15 strips. I can't return them because they're already painted. I'm not happy about that because whichever vendor did the estimating should have had a number closer to reality than that. But the material wasn't TOO expensive, so I guess it could be worse.
I also finished the backsplash on one kitchen wall this week. It's grouted and sealed. That allowed me to install the range hood. As far I as know, I'm now ready for the final inspection! I tried calling for it today but ran into government thinking... They were booked for today, and I couldn't have them come out Monday due to other commitments. They don't schedule out past one work day so I need to call back Monday in order to schedule it for Tuesday...
Tuesday will also be the day for the installer to put up all my window shades. I'll finally be able to take the cardboard and black plastic sheeting off all the windows!
My office furniture should be coming from Dallas on Monday or Tuesday. I'm in the final stages of picking a stain color for that.
Oh, and I almost forgot: my sofa and love seat were delivered last Tuesday! I hosted my first movie night with some friends on Sunday night. We watched Star Wars (episode IV). It was really cool having people over to my own place.
Here are some of the latest pictures. The only thing outdated here is the wall behind the stove. I don't have a pic of the range hood yet.
I have a lot of base moulding left over. About 15 strips. I can't return them because they're already painted. I'm not happy about that because whichever vendor did the estimating should have had a number closer to reality than that. But the material wasn't TOO expensive, so I guess it could be worse.
I also finished the backsplash on one kitchen wall this week. It's grouted and sealed. That allowed me to install the range hood. As far I as know, I'm now ready for the final inspection! I tried calling for it today but ran into government thinking... They were booked for today, and I couldn't have them come out Monday due to other commitments. They don't schedule out past one work day so I need to call back Monday in order to schedule it for Tuesday...
Tuesday will also be the day for the installer to put up all my window shades. I'll finally be able to take the cardboard and black plastic sheeting off all the windows!
My office furniture should be coming from Dallas on Monday or Tuesday. I'm in the final stages of picking a stain color for that.
Oh, and I almost forgot: my sofa and love seat were delivered last Tuesday! I hosted my first movie night with some friends on Sunday night. We watched Star Wars (episode IV). It was really cool having people over to my own place.
Here are some of the latest pictures. The only thing outdated here is the wall behind the stove. I don't have a pic of the range hood yet.
Labels:
appliances,
backsplash,
interior trim,
kitchen,
sofa,
tile
Subscribe to:
Posts (Atom)