It rained yesterday, so we turned our attention back inside to make sure the appliances fit in their spaces and run anything between cabinets that is best done before the countertops go in. This includes mostly the lines between the sink cabinet and the dishwasher. The plumber is set to come out tomorrow to make sure everything's in place.
Today, the alarm was installed. He had to re-work some of the zones we originally designed. There was one point where it looked like we had a short in a line or a broken circuit somewhere, but we found the problem and worked it out. So I'm secured with an alarm siren now.
We also put up the formica sheets as backsplashes behind all three utility sink locations. Finally, we took the temporary pole out of the ground today. The paver guys will return shortly to patch over that spot.
Monday, March 16, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment